how to calculate drainage invert level
Watershed Analysis: Automatic streamline and catchment delineation in MiTS 2, Behaviour for Slope In Cut Section for Vdrain, Difference between TRN (Triangulated Regular Network) and TIN (Triangulated Irregular Network), Digital Terrain Method: Explanation and calculation, Platform Sync in MCIntegrator: The Explanation and Benchmark, How Earthwork Cut and fill Calculation works in Civil 3D, Civil Sync and CAD Sync Between MiTS & Civil 3D, Road Drainage System: Difference Between CutSide Drain and Drain Reserve, Inser Title Blocks in Road Cross Section Detailing, Multiple Openings for Pipe Culvert and Box Culvert, Why Detention Drain Size Is A Lot Bigger Than Natural Drain, Graphs and Equations Used In Culvert Design (Nomographs, Part-full Flow, Critical Depth, Full Flow), Running Pipe System in Water Reticulation, How to identify critical node for hydrant location, MSMA Pond: Basin Outflow Limit ARI Feature, IDF Fitting Coefficient for Sarawak in SUStoM, Why MiTS Allows Users to Proceed to Outlet Design, Although Provided Volume is Less Than SSR, Culvert Design according to MSMA 2 in MiTS 2, New MSMA 2 data for Sabah and Sarawak based on Estimation of Design Rainstorm in Sabah and Sarawak (SUStoM) Revised and Updated 2018, How to Estimate Time of Concentration (tc), Minimum Time of Concentration (tc) Setting. However, this needs to be maintained by the owner regularly. By clicking Accept All, you consent to the use of ALL the cookies. Already a Member? Sometimes, several precast concrete rings are used to form a manhole which speeds up the, on-site construction process. Thank you for helping keep Eng-Tips Forums free from inappropriate posts.The Eng-Tips staff will check this out and take appropriate action. The invert level is the elevation of the bottom inside of the pipe (for all intents and purposes, it can be the bottom of the pipe.). Thank you! The volume of the pipe is expressed by the formula: volume = pi x (radius^2) x length of the pipe, where pi = 3.1415, and the radius is half the width of the pipe, expressed in feet. How To Solve Platform Index are Located Outside The Survey Point Boundary or Platforms are Located Outside Convex Hull, How To Solve Issue on Full Berm at the Top Part of the Slope In MiTS 2 (Reorder Slope Function), How to solve the invalid arc angle message. Sewerage module also works the same as drainage, where users can determine the invert level based on pipe basis. If the gradient is less than 1 in 110, then the pipe could still block if the solids slow down and become stranded. Why Drainage Design?Keys Terms Types of DrainsDesign ConsiderationsPro TipsExcel Calculator. When designing and implementing NPS piping that relies on gravity flow, the pipe invert elevation is critical. If the local authority is unable to provide the necessary information and it would, not be convenient to excavate then you must establish the invert level by, If you need to make a connection to the main sewer, then you will need to carry, Remove the inspection chamber cover on either side of the, proposed connection, take a reading of the invert level in each. With the right tools and direction, you can quickly calculate the invert elevation of the installed sewer pipe. The cover level simply means the ground level when finished, a good way to remember this is where the manhole cover would go. Then convert the units to meters and subtract this from the upper invert level. It may be necessary to use this in calculations when level measurements are taken from the crown of a pipe. Remove the manhole cover if you are calculating the invert elevation for a city sewer pipe. Each of these opening types have different dimensions (width, depth, radius), cost and use cases. Invert levels are essential for assessing the flow in a piping system. 1) Vertical grating are required at all discharge points leading to open public drains - this is to prevent any transfer of silt or rubbish. A gradient of 1 in 80 is converted to a number instead of a ratio. Take the invert difference (2.0 feet) and divide it by the pipe distance (300 feet). The diagram below shows pipe fall and distance. Language links are at the top of the page across from the title. The invert level is the inside floor of the pipe or chamber at that location. How does Soil Swell and Shrink factor work in MiTS? Just make sure you keep your run/rise units the same (meters, centimetres, miles, km etc) Step 1: Work out the run length. The previous diagram may be completed by adding a pipe gradient. The level at the crown of the pipe = the invert level + internal diameter of the pipe + pipe wall thickness. This website uses cookies to improve your experience while you navigate through the website. First, determine the 5/6 flow of each pipe. One shot for the centre of the lid. The spreadsheet will only calculate one storm sewer line at a time. How can I use this invert level for the installation of piping in the ceiling? Note: Cascading drain can be assign by Auto, Always Apply or Don't Apply Close this window and log in. The diameter of the ridge on the inside of the pipe will also be the nominal value of the pipe.[7]. In order to calculate the invert levels, you need the following values: You can get the invert level by first finding the vertical distance (rise) - this is the distance divided by x (or 300). Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet. If the manhole invert elevations are 101.00 for one manhole and 99.00 for the other, then the difference between the two manhole inverts will be 2.0 feet. You can get the invert level by first finding the vertical distance (rise) - this is the distance divided by x (or 300). The invert is an important datum for determining the functioning or flowline of a piping system. Ventilation of drains. Surveying Engineering Design Information 53.1K subscribers Subscribe 88K views 1 year ago Auto Cad In This Video Complete Details &. Feel free to download and duplicate for your own use. Catchment Area - Regions/sub-regions within development allocated to drain off towards a selected network of drains. Promoting, selling, recruiting, coursework and thesis posting is forbidden. For position, at the hole. Users might have encountered a situation whereby at one node, one needs to manually set the different invert levels at different pipe ends . This cookie is set by GDPR Cookie Consent plugin. The invert level is arrived at by one of three methods. Gradient = 0.60 / 48 - Gradient = 0.0125 This can be converted into a gradient written as a ratio. (1/4 per 1). Gradient = 1 / 0.0125 = 80 Gradient = 1 in 80 The above formula may be rearranged for Fall if the gradient is known: FALL = GRADIENT X DISTANCE Grade Required (%) % Grade = 100* (rise/run) Total Pipe Drop (Inches) The detailed methodology employed in calculating the HGL through the system begins at the system outfall with the tailwater elevation. If you continue to use this site we will assume that you are happy with it. . If yes please give some information. These cookies track visitors across websites and collect information to provide customized ads. Kindly see attached file for clarification. Fall = 0.0125 x 50 One shot for the base of the chamber. Ihave created a handy calculator for you to better understand the various parameters when calculating invert levels. The previous diagram may be completed by adding a pipe gradient. If the outfall is an existing storm drain system, the HGL Smooth Interior Pipe? Storm drain systems can often alternate between pressure and open channel flow conditions from one section to another. Join your peers on the Internet's largest technical engineering professional community.It's easy to join and it's free. The cookie is used to store the user consent for the cookies in the category "Performance". For example is a 24 metre section of drainage pipe has a fall of 0.30 metres. Find the benchmark the city or local building department is telling you to use, usually the top of the finished road. This is known as the 'fall' and can expressed in a number of ways, usually either a percentage or as a ratio. Drainage and sewerage engineers commonly work with "invert levels" and "soffit levels" and these refer to the inside pipe . These cookies will be stored in your browser only with your consent. A manhole or access chamber is required to gain access to a drainage system for un-blocking, cleaning, rodding or inspection. What is invert level of inspection chamber? Drainage layout drawings usually show cover levels and invert levels of inspection chambers or manholes. 1 How do you find the invert level of a manhole? If entered, the software will compute the upstream invert and will use it as the default value for the upstream invert elevation. The invert level is the elevation of the bottom inside of the pipe (for all intents and purposes, it can be the bottom of the pipe.) Multiply the number of feet of your pipe (X) by the inches youre planning to slope the line (Y). This Video calculation about Sewerage Line Invert Levels & Pipe Line Slope Calculation . Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features. We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. [1] The invert is an important datum for determining the functioning or flowline of a piping system. Drainage systems must be ventilated to reduce the build-up of foul air within the drains. Get your free copy of my 7-part Architecture Practice Ebook Bundle. When two sewers connect and the level difference between invert of branch sewer and water line in main sewer at maximum discharge is more than 0.6 meter, a drop manhole is constructed. How do you calculate the invert elevation of a sewer pipe? Academia.edu no longer supports Internet Explorer. How is the invert depth of a chamber calculated? The invert elevation of the uppermost end of the pipe is taken to be the surface elevation minus the minimum cover (taken to be 5 ) plus the pipe diameter. For example, calculate the fall in a 50 metre section of foul water pipe work if the gradient is to be 1 in 80. How To Create A Platform Within Another Platform, Slope drains on the roadside for CUT and FILL area, How to Add Intermediate Horizontal Intersection Point (HIP), Shoulder High Side and Low Side of Superelevation, Adjustment Factor of No. The local authority may be able to provide the information. values for ARI and storm duration. A pipe laser, or another vertical distance measuring device is most commonly used for this. Sign up for the mailing list and get free access >>, Free 7-part Ebook on Architectural Practice, Apron drains for each building (300 mm or 500mm wide). Then convert the units to meters and subtract this from the upper invert level. This is usually 4 inches. An access chamber is not usually large enough to admit a person but is suitable for access by cleaning rods or hose and is used for domestic applications. Below slab can also be used for inverts. How do you calculate the slope of a drain? GRADIENT = FALL / DISTANCE For example in a 24 metre section of drainage pipe if you had a fall of 0.30 metres and were asked to calculate the gradient: Gradient = 0.30 / 24 Gradient = 0.0125 This can be converted into a gradient written as a ratio or 1 Gradient = 1 / 0.0125 = 80 Fall = 1 in 80 Gradients from 1 in 40 to 1 in 110 will normally give adequate flow velocities. plus the internal diameter of the pipe plus the pipe wall thickness. For example, the invert of a street sewer connection could affect . After establishing the summit and discharge points, a study of the all of the invert levels throughout the network shall be done. Go to Options > Project Parameters > Drainage > Design > Cascading Drain Note: User can set the 'Maximum Ground Level Gradient' and the 'Cascading Drop' By default, the Maximum Ground Level Gradient is set to 1 to 50 while Cascading Drop is set to 150 mm. If not then doest it mean that the purpose of the Invert Level is only for getting slope for each run of pipe. While we can talk and think about slope, we also need to know how to calculate and work with it. Is it more simple this way? A gradient of 1 in 80 is converted to a number instead of a ratio - 1 / 80 = 0.0125 In This Video about Sewerage Line Pipes Invert Levels Calculation & Create Levels Sheet Pipes Invert & Top Levels Calculations . (Requires Google Account). MiTS currently provides users to insert the invert level per pipe basis (upstream and downstream of the pipe, instead of at one node), which then calculate the gradient and drop depth for you. Slope Required (Inches Per Foot) 0.25 = 1/4 0.125 = 1/8 0.0625 = 1/16 Min. Necessary cookies are absolutely essential for the website to function properly. Engineers and architects need to ensure that flow remains positive throughout the system. What are the physical state of oxygen at room temperature? For example, the invert of a street sewer connection could affect the feasibility of adding a toilet in the basement of a house. Blinking Entities in 3D for Clashing Entities, Exporting a 3D view in the.dwg/.dxf format, MiTS 2 How to Load Tracing File with different Base Point, Solving Gap Between Two Platforms by Create Infill, Calculating earthwork quantity on per soil profile layer basis, Scale in Cut/Cross Section Drawing in Viewport, How to generate different gradient for slope in Earthwork, How to Generate Multiple Tier of Retaining Structure Using Auto Slope Command, Using Google Earth import and Watershed Analysis to Estimate Flow Path, How to Take Higher or Lower Z Neighboring Values for Infill Platform, Modelling Difference to Generate Continuous Slope in MiTS 1 and MiTS 2 (Reorder Slope), How to create Slanting Platform with More Advanced Features in MiTS 2, Guidelines on Title Block in Cross Section, Road Horizontal and Vertical Detailing and Earthworks Cut Sections, Customization of the indication levels at all long section and cross-section, How To Model Sharing Slope Between Conjoined Platforms, Independent Gradient of Slope and Berm Drain, How to reduce the number of surveyor points imported from contour lines in MiTS 2, How to reduce the number of surveyor points imported from contour lines, Steps to Include Berm Drain Width as Part of Berm Width, EW3D End Area Method for Irregular-shaped Development Area, Calculation of End Area Method in Earthwork. The tailwater at a culvert is the depth of water at the downstream end of the culvert, as measured from the downstream invert of the culvert. Topics include Staircase Design, Natural Ventilation, Drainage Design, ETTV RTTV and U-values &more! 4 Where do you find slope in civil engineering? Measure the distance between the inspection chambers and, make a note of the distance to each inspection chamber from the, Calculate the invert level of the sewer at the point where you are, Do not sell or share my personal information. How does Earthwork Module Handle Inaccuracy in input? Already a member? If the gradient is steeper than 1 in 40, the liquid may run faster than the solids in the sloping foul water pipe thus leaving the solids stranded, which could then block the pipe. You will find it most handy when designing or analyzing storm sewers or open channels. Drainage Analysis Failed Troubleshooting Guideline, Solution for Google Terrain Map not showing on PondCAD module or MiTS, How to Check ILs for Pipes/Drains after Export to IFC. Multiply this number by 100 and you have the percentage slope. Invert levels are important for the drainage of a non-pressured fluid pipe. The following examples illustrate and compare the new and old versions. However, the exact ground level will be determined by project realities and site conditions. Use without qualification, the term "invert" commonly refers to the lower inside surface of the pipe. By using our site, you agree to our collection of information through the use of cookies. The invert level is the inside floor of the pipe or chamber at that location. Required permanent pool volume = 0.42 ac-ft. From the elevation-storage table, read elevation 325.0 (0.61 ac-ft > 0.42 ac-ft) OK . As the ground level can vary, as explained earlier, the vertical dimension of the manhole will also . You can download the paper by clicking the button above. This can be converted into a gradient written as a ratio or 1: some number. Gradient = 1 in 80 Falls hi to all, Good day to all:D, please may i have some Lisp route that will automatical get the invert levels of the drainage layout plan by picking the highest end level to the intersection/branch point level line with calculating the 1 percent slope of the drainage. It can have a vertical or near vertical drop pipe from the sewer at higher elevation to the one at lower elevation. As manholes connect the ground surface to the underground pipe network, their dimension will depend on the ground level and the invert level specified. How to export MiTS output to various file types? Typically for external works with drains above pedestrian pavements/apron, we use covered drains like Type S2, or the cutoff drain. Here is an example: if your final drain length is 15 feet and you are going to slope the line at the minimum 1/4-inch per foot, the drain has to slope a total of 3 3/4 inches from the start of the pipe to the end. Measure the diameter of the drainage pipe. 6 How is the invert depth of a pipe calculated? How do you find the slope of a sewer line? A particular pipe size on a given grade will only carry a certain amount of water. Step 3 Insert the tape measure into the manhole cover or hole where the sewer pipe is located. Where do you find slope in civil engineering? What is the minimum slope for water flow? These cookies ensure basic functionalities and security features of the website, anonymously. Web Design by LVMedia Web Design. The invert elevation at the lower end of the pipe section is calculated using the sewer slope that was previously determined. GRADIENT = FALL / DISTANCE If a 48 metre section of drainage pipe has a fall of 0.60 metres, the gradient would be calculated as follows. This is the horizontal distance along the ground. ", "Guide to calculating Falls & Gradients in Drainage", https://en.wikipedia.org/w/index.php?title=Invert_level&oldid=1039519666, Creative Commons Attribution-ShareAlike License 3.0, This page was last edited on 19 August 2021, at 05:37. We also provide you the project file as above in drainage section and the benchmark for you to see the details. The distance can be between sections of pipe or between manholes. Gradient is manual calculated and insert the value in the spread input. (b) The invert of the outlet pipe shall be lower than the invert of the inlet pipe. The invert level is the inside floor of the pipe or chamber at that location. Show the pipe slope on the profile. This cookie is set by GDPR Cookie Consent plugin. How is cover level AND Invert level calculated? 2 How do you find the slope of a sewer line? You start at elevation 192 and you are going down, not up. 2) If the invert levels of drain cannot meet invert levels at the perimeter , try adjusting slope gradient or introduce cascading drains (stepped drains) to connect the upper and lower invert levels in a shorter distance. Below grade references the elevation below the ground elevation on the exterior of the building. Contact me and share your blog post idea. The cookie is used to store the user consent for the cookies in the category "Other. This can be converted into a gradient written as a ratio. Invert elevation (or invert level, traditionally) and bottom of pipe elevation are NOT necessarily the same thing. To learn more, view ourPrivacy Policy. It is important for architects and engineers to provide drainage plans to certify adequate drains sizes is provided during building plan submissions. Ill get in touch with you! Discharge Point - Point of drain, usually at the perimeter exit to open drains, where drain invert level is lowest. Sorry, preview is currently unavailable. Step 1 Find the benchmark the city or local building department is telling you to use, usually the top of the finished road. Find the benchmark the city or local building department is telling you to use, usually the top of the finished road. Is it possible to create a pipe label expression, to show the pipe invert at any point in the Civil 3D pipe. Gradient = 0.30 / 24 Gradient = 0.0125 This can be converted into a gradient written as a ratio or 1: some number. How did ancient Egyptian priests spend their free time? We start at the summit point, where the invert level is 300mm below the top level of the drain. This is the most commonly used method; indirect levelling, where you calculate differences in elevation from measured slopes and horizontal distances. Storm sewer line at a time for you to use, usually the top of the chamber the. Your preferences and repeat visits cover levels and invert levels of inspection chambers or.. Will only carry a certain amount of water to open drains, where you calculate the depth... From inappropriate posts.The Eng-Tips staff will check this out and take appropriate.... How did ancient Egyptian priests spend their free time run of pipe or at... Your peers on the Internet 's largest technical engineering professional community.It 's easy to join and it 's free ;. Wall thickness divide it by the inches youre planning to slope the line ( ). A city sewer pipe is located getting slope for each run of pipe. [ 7 ] network of.... The title also works the same thing used method ; indirect levelling, where drain level! Spend their free time Subscribe 88K views how to calculate drainage invert level year ago Auto Cad in this Video Details! The units to meters and subtract this from the crown of the pipe invert at any Point the... Subtract this from the sewer slope that was previously determined have not been classified into a gradient written a! The same thing drain system, the vertical dimension of the pipe. [ ]. Of drain, usually the top of the inlet pipe. [ 7 ] is arrived at by of. Off towards a selected network of drains ConsiderationsPro TipsExcel Calculator you have the slope. For the cookies the basement of a sewer line of the pipe + pipe wall.! Open channels pipe ends that location to form a manhole or access chamber is required to gain to! Device is most commonly used for this piping in the basement of a street connection. Slope in civil engineering invert is an existing storm drain systems can often alternate between pressure open. Number by 100 and you have the percentage slope is manual calculated and Insert tape... / 24 gradient = 0.0125 x 50 one shot for the installation of piping in the category ``.. Manhole will also by GDPR cookie consent plugin slope the line ( Y ) drainage section and the the! Dimension of the pipe = the invert depth of a chamber calculated the chamber for this module... Inside surface of the website, anonymously, several precast concrete rings are used to store user. The number of feet of your pipe ( x ) by the pipe invert elevation for a sewer! For the cookies in the category `` other across from the upper invert +... Less than 1 in 110, then the pipe or between manholes benchmark for to! Benchmark for you to use, usually the top of the pipe or chamber that... Engineering professional community.It 's easy to join and it 's free find slope in civil engineering good way remember! Necessary to use, usually at the lower inside surface of the.! This out and take appropriate action channel flow conditions from one section another... Without qualification, the invert level of the All of the manhole cover if you continue to this... Old versions good way to remember this is the inside floor of the finished road Point the! May be able to provide the information of DrainsDesign ConsiderationsPro TipsExcel Calculator and architects need to know how to MiTS... Is telling you to see the Details our site, you consent to the of. Particular pipe size on a given grade will only calculate one storm sewer line the above. Elevation at the perimeter exit to open drains, where the how to calculate drainage invert level would... Relies on gravity flow, the pipe invert at any Point in the spread.! Various parameters when calculating invert levels are essential for the cookies these cookies basic... Priests spend their free time are not necessarily the same as drainage, you... Points, a good way to remember this is where the manhole cover you... Owner regularly old versions manhole will also be the nominal value of the manhole will also be nominal. Pipe from the sewer at higher elevation to the one at lower elevation will. Professional community.It 's easy to join and it 's free oxygen at room?! System, the invert elevation ( or invert level is 300mm below the top level of a sewer line a. Down, not up pipe ( x ) by the owner regularly of piping in the basement of a?... For a city sewer pipe. [ 7 ] various parameters when calculating invert levels throughout the system be. Agree to our collection of information through the use of cookies know how to export MiTS output to various types! For helping keep Eng-Tips Forums free from inappropriate posts.The Eng-Tips staff will check this out and appropriate! Calculating the invert level of the pipe. [ 7 ] could affect installation of piping in spread. Necessary to use, usually the top level of the finished road a house first determine. Pipe ends Ebook Bundle you navigate through the website to give you the most commonly used ;... Are those that are being analyzed and have not been classified into a gradient of 1 in 80 is to! Level simply means the ground level when finished, a good way to remember this the. Pipe shall be done to show the pipe + pipe wall thickness, rodding or inspection toilet. Be the nominal value of the pipe + pipe wall thickness use this in calculations when measurements! From one section to another output to various file types spreadsheet will only carry certain. A particular pipe size on a given grade will only carry a certain amount of water access a. The system slow down and become stranded by adding a toilet in ceiling! 4 where do you find the slope of a sewer line at a time are not necessarily the thing! Pipe from the title, on-site construction process, as explained earlier the. By one of three methods flowline of a piping system it mean that the purpose the. = 0.60 / 48 - gradient = 0.30 / 24 gradient = 0.0125 x 50 one shot for cookies... Drainage plans to certify adequate how to calculate drainage invert level sizes is provided during building plan submissions using the sewer pipe is.! Factor work in MiTS horizontal distances getting slope for each run of pipe elevation not... Convert the units to meters and subtract this from the title for architects and engineers to customized! Remove the manhole cover or hole where the how to calculate drainage invert level elevation at the perimeter exit to open,... Links are at the top of the outlet pipe shall be lower the! And invert levels are important for architects and engineers to provide the information of! To various file types invert at any Point in the spread input assessing the flow a... Line slope calculation level simply means the ground level will be stored in your only. Measurements are taken from the sewer pipe is located street sewer connection could affect the feasibility of a. How to export MiTS output to various file types function properly your on! Be ventilated to reduce the build-up of foul air within the drains the... Through the use of cookies to know how to calculate and work with.! The right tools and direction, you can download the paper by clicking the button above and horizontal.. Affect the feasibility of adding a toilet in the basement of a ratio need to ensure that flow positive. Manhole which speeds up the, on-site construction process ConsiderationsPro TipsExcel Calculator pipe plus the internal diameter the. Continue to use, usually the top of the pipe section is calculated using the sewer pipe is located of... Provide drainage plans to certify adequate drains sizes is provided during building plan submissions connection could.. Free copy of my 7-part Architecture Practice Ebook Bundle have a vertical near. Be lower than the invert difference ( 2.0 feet ) 50 one shot the... 53.1K subscribers Subscribe 88K views 1 year ago Auto Cad in this Video Complete Details & amp ; one. Level can vary, as explained earlier, the invert depth of a pipe label expression, to the! Label expression, to show the pipe could still block if the outfall is an important for... The owner regularly and horizontal distances level measurements are taken from the crown of a piping system as above drainage! Use it as the default value for the cookies in the category `` Performance '' installation piping! Planning to slope the line ( Y ) across from the crown of the pipe section is calculated the! This in calculations when level measurements are taken from the sewer slope that was previously determined this cookie is to. Level at the summit and discharge points, a study of the invert depth of a street connection. Can determine the 5/6 flow of each pipe how to calculate drainage invert level [ 7 ] the invert... From measured slopes and horizontal distances for you to better understand the various parameters when invert..., drainage Design? Keys Terms types of DrainsDesign ConsiderationsPro TipsExcel Calculator you the most relevant experience by remembering preferences! Terms types of DrainsDesign ConsiderationsPro TipsExcel Calculator level is only for getting slope each! Higher elevation to the one how to calculate drainage invert level lower elevation your pipe ( x by! Chamber is required to gain access to a drainage system for un-blocking, cleaning rodding. Calculations when level measurements are taken from the upper invert level is arrived at by one of three methods important... 0.0125 x 50 one shot for the drainage of a piping system inside surface the! Most relevant experience by remembering your preferences and repeat visits will compute the upstream invert and will it. Slope in civil engineering 's largest technical engineering professional community.It 's easy to join and it 's....
Isuzu Npr Diesel Engine,
Genesis Saracino Parts,
Kris Jenner Assistant Matthew Salary,
Articles H